A New Multi-Purpose Venue Coming to Lordswood Leisure Centre

Whether you’re saying “I do,” hosting a productive meeting, or participating in an energising fitness class, our new building offers the perfect backdrop for every occasion. The Garden Suite is a stunning new venue space that combines modern facilities, flexible design, and an atmosphere that inspires.

Expected completion: Early 2026

What Is The Garden Suite?

The Garden Suite is a brand-new, purpose-built multi-functional space designed to adapt to your needs. From intimate celebrations to corporate events, from fitness classes to community gatherings — this versatile venue does it all.

Thanks to neutral, contemporary decor and state-of-the-art facilities, The Garden Suite seamlessly transforms to suit any occasion, ensuring every event feels special and uniquely yours.

Where Will It Be?

The Garden Suite will be a standalone new building located at Lordswood Leisure Centre in the garden area to the rear of reception. The new building will provide a dedicated space that’s separate from our existing facilities yet fully integrated into our community hub.

These are concept images provided for visual reference only.
The final look, design and equipment are subject to change.
These images are for representation only and do not represent the final product.

Perfect For Every Occasion

Weddings & Celebrations

Create unforgettable memories in a beautiful, modern space. The neutral decor provides the perfect canvas for your wedding vision, while our professional facilities ensure your day runs smoothly.

Corporate Events & Meetings

Host productive meetings, conferences, and training sessions in a professional environment equipped with cutting-edge technology and comfortable amenities.

Fitness Classes

Enjoy energising group fitness sessions in a spacious, climate-controlled environment with premium sound and lighting systems.

What’s Inside

Neutral Yet Modern Decor

Sophisticated, contemporary styling that complements any theme or brand. The versatile aesthetic ensures your event looks exactly how you envision it.

Air Conditioning

Year-round comfort for you and your guests, regardless of the season or event type.

Controllable Lighting

Customisable lighting systems that set the perfect mood — from bright and energising for fitness classes to warm and intimate for celebrations.

Premium Sound System

Crystal-clear audio for presentations, music, or fitness instruction. Professional-grade equipment ensures every word and note is heard perfectly.

85″ Screen

Large-format display perfect for presentations, video content, slideshows, or entertainment. Ideal for corporate events and celebrations alike.

Flexible Layout

Adaptable space configuration to suit your specific needs, whether it’s theatre-style seating, banquet setup, or open floor space.

Build Progress

Building works are expected to be completed in Early 2026

We’ll be sharing regular updates throughout the construction process, so you can follow along as your new training space takes shape.
From the footings to the finishing touch, you’ll be part of every milestone.

50%

Updates

Monday 17th November 2025

  • The roof trusses are now all in place and secured

Tuesday 4th November 2025

  • Progress has been made on the external walls and they are flying up rapidly!

Thursday 6th November 2025

  • The external walls are progressing well, all 4 sides are now being built up
  • Scaffolding has been installed so that work can begin on the upper sections and the roof can be installed soon

Monday 10th November 2025

  • The external walls are now fully in place
  • The walls for the internal storage areas have been installed

Tuesday 11th November 2025

  • Scaffolding has now been extended to all the sides of the building ready for the roof installation

Thursday 13th November 2025

  • The roof trusses have arrived on site ready for installation across the weekend

Saturday 15th November 2025

  • The steel beams for the entrance area have been installed
  • The roof truss installation has begun

Sunday 16th November 2025

  • The final roof trusses are being put in place

Monday 3rd November 2025

  • Blockwork has begun and the external walls are flying up

Friday 31st October 2025

  • Steel windposts have been installed
  • Concrete for the base has been poured

Thursday 30th October 2025

  • The base for the new building is being prepared
  • Blockwork has arrived, ready to be installed

Tuesday 28th October 2025

  • The footings for the building have been poured

Monday 27th October 2025

  • The existing marquee structure has been removed and the work on footings and the base have begun.